Most overspending in a house renovation is not accidental: it comes from a handful of typical mistakes. Here are ten of them and what to do instead.
1. Starting without a design project
Decisions made on site cost more than decisions made on paper. Anything decided before work starts can be changed with an eraser; anything after — with concrete.
2. Not planning the engineering before finishes
Sockets, underfloor heating, ventilation, cables for lighting and low-voltage systems. Adding them after the finishes means breaking a brand-new renovation.
3. Buying furniture before the layout
First the layout and dimensions, then the furniture. Otherwise sockets end up behind a wardrobe and doors won’t open.
4. Saving on waterproofing and base preparation
Wet areas and floors under tiles are where mistakes show up a year later, when fixing them costs the most.
5. Changing decisions mid-way
Every change during works means idle crews, rework and new materials. Approve decisions at the design stage.
6. No contingency budget
A house renovation always brings unexpected work. Set aside 10–15% of the estimate.
7. Choosing a contractor on price alone
A cheap quote without a detailed estimate usually means extra bills later. Compare estimates line by line.
8. Working without a contract and acceptance reports
Stages, deadlines, payments, warranty and acceptance reports should be on paper. This protects both sides.
9. Not checking each stage
Inspect the work while it is still visible: engineering runs, waterproofing, levelling. Once finished, it can’t be checked. That is what author supervision is for.
10. Stretching the project over years
Renovating “at weekends” costs more: materials get pricier, crews change, decisions go out of date. A clear schedule and project management work better.
What to do about it
Start with a design project, set aside a contingency, arrange supervision and don’t start finishes until the engineering is closed.